OVERSEAS PROJECT

ZERO Energy Office Building, Malaysia

10℃ PCM-TES Passive Floor Cooling

ZERO Energy Office Building, Malaysia

Central Air Condoning Chilled Water TES : 200RT/hr

BocaPCM applied: E10

According to the official performance report from Malaysia government:

Having installed the BocaPCM-TES system, the building enjoyed a very high level of energy saving in annual electricity consumption by HVAC from 85kWh/sqm to 23kWh/sqm.

Amount to 70% savings of electricity consumption!

ZEO Malaysia Project 頁面 01
ZEO Malaysia Project 頁面 02
ZEO Malaysia Project 頁面 03
ZEO Malaysia Project 頁面 04
ZEO Malaysia Project 頁面 05
ZEO Malaysia Project 頁面 06
ZEO Malaysia Project 頁面 07
ZEO Malaysia Project 頁面 08
ZEO Malaysia Project 頁面 09
ZEO Malaysia Project 頁面 10
ZEO Malaysia Project 頁面 11
ZEO Malaysia Project 頁面 12
ZEO Malaysia Project 頁面 13
ZEO Malaysia Project 頁面 14
ZEO Malaysia Project 頁面 15
ZEO Malaysia Project 頁面 16
ZEO Malaysia Project 頁面 17
ZEO Malaysia Project 頁面 18
ZEO Malaysia Project 頁面 19
ZEO Malaysia Project 頁面 20
ZEO Malaysia Project 頁面 21
ZEO Malaysia Project 頁面 22
ZEO Malaysia Project 頁面 23