OVERSEAS PROJECT

Turin, Italy

13℃ & 46℃ PCM
Geothermal Energy Storage & Applications

Turin, Italy

In this project, the BocaPCM-TES system was installed (using 13℃ and 46℃ PCM) for cooling and heating functions respectively powered by stored geothermal heat. The Phase Change Materials used in this project were produced by Boca and shipped to the site. 

This is a typical application of PCM-TES in conserving Geothermal Energy.

Download a report on this project: EIDOS-report-2008_Boca

Italy EIDOS 頁面 01
Italy EIDOS 頁面 02
Italy EIDOS 頁面 03
Italy EIDOS 頁面 04
Italy EIDOS 頁面 05
Italy EIDOS 頁面 06
Italy EIDOS 頁面 07
Italy EIDOS 頁面 08
Italy EIDOS 頁面 09
Italy EIDOS 頁面 10
Italy EIDOS 頁面 11